# North Shore Announces Binding Term Sheet for Rio Puerco Uranium Project in New Mexico, USA

- Link: https://europeanbusinessmagazine.com/north-shore-announces-binding-term-sheet-for-rio-puerco-uranium-project-in-new-mexico-usa/
- Published: 2025-06-24T14:45:00+00:00
- Author: EBM Mediawire

**VANCOUVER, BC / [ACCESS Newswire](https://www.accessnewswire.com/) / June 24, 
2025 / ****North Shore Uranium Ltd. (TSXV:NSU) **(“**North Shore**” or the “**Company**“)
is pleased to announce that on June 23, 2025, it signed a binding term sheet (the“**
Term Sheet**“) with Resurrection Mining LLC (“**Resurrection**“), an arm’s length
party, to acquire up to 87.5% of the Rio Puerco uranium project (“**Rio Puerco**”
or the “**Project**“) in northwestern New Mexico (the “**Transaction**“).

**TRANSACTION AND PROJECT HIGHLIGHTS**

 * **Historical resource estimate of 6.0 million tonnes at an average grade of 0.09%
   eU_( 3) O_( 8 )for 11.4 million lbs. of U_( 3) O_( 8) reported in 2009**
 * 
   ### Join The European Business Briefing
   
 * New subscribers this quarter are entered into a draw to win a Rolex Submariner.
   Join 40,000+ founders, investors and executives who read EBM every day.
 *  [Subscribe](https://europeanbusinessmagazine.beehiiv.com/subscribe)
 * **Substantial historical dataset to guide and optimize future exploration programs**
 * **Preliminary review of historical data suggests the potential for In-Situ Recovery(“
   ISR”) mining, the lowest cost method for producing uranium**
 * **Located in the Grants Uranium District, the largest producer of uranium in 
   the United States and near two significant active uranium projects, Marquez-Juan
   Tafoya (Anfield Energy Inc.) and Cebolleta (Premier American Uranium Inc.)**
 * **Strong US government support for nuclear power and uranium mining projects 
   and a stated objective to reduce reliance on foreign nuclear fuel**
    - **Executive Orders issued by President Trump in late May 2025 include a call
      for quadrupling US nuclear capacity by 2050, accelerating new reactor development,
      strengthening the US nuclear fuel supply chain and reforming the US regulatory
      environment**
 * **Staged earn-in structure allows the Company to optimize exploration programs**
 * **Would provide North Shore with uranium exposure in two North American jurisdictions,
   the Athabasca Basin in Saskatchewan, Canada and the western USA**

**Brooke Clements, President and CEO of North Shore stated:** “_The Rio Puerco project
in New Mexico offers us exposure to a uranium project in the USA with excellent 
upside and signficant historical exploration data including a historical resource
estimate. The US government has recently enacted policies designed to accelerate
nuclear power and uranium mining activity in the country. In the 1970s, Kerr-McGee
commenced mine construction at Rio Puerco, but activity was halted after a short
trial-mining phase due to low uranium prices. The Project offers a great opportunity
to confirm and expand upon previous work through drilling, modern 3-D modelling 
and continued assessment of the ISR potential. On completion of the Transaction 
with Resurrection, we will have uranium exposure in two North American jurisdictions
that have seen signficant uranium production, the Grants Uranium District and the
Athabasca Basin, at a time when future supply-demand fundamentals look great for
the industry.”_

Rio Puerco is located at the eastern end of the Grants Uranium District, approximately
60 kilometres northwest of Albuquerque, New Mexico (Figure 1). Mines that operated
between 1950 and 2002 contributed to make the Grants Uranium District the leading
historical uranium producing district in the United States.

![](https://europeanbusinessmagazine.com/wp-content/uploads/2025/06/nsu-06242025-
img1.jpg)

**Figure 1:** Rio Puerco Location Map, New Mexico. Roca Honda (Energy Fuels), Marquez-
Juan Tafoya (Anfield Energy) and Cebolleta (Premier American Uranium) are advanced
exploration/development stage uranium projects.

**RIO PUERCO PROJECT SUMMARY**

Rio Puerco consists of 37 Bureau of Land Management mining claims and significant
historic exploration and mining data as well as the rights to a water well. Historical
exploration and development work by Kerr-McGee Corporation (** “Kerr McGee”** ) 
in the 1960s and 1970s, and geologic and resource modelling work completed by two
Australian companies in 2009 and 2011 validate the potential for Rio Puerco to host
a significant uranium resource.

Uranium was first discovered at Rio Puerco in 1968. The claims covering the discovery
were ultimately optioned to Kerr-McGee who drilled over 1,000 holes. Based on the
results of that work, they began the development of the Rio Puerco Mine in the 1970s.
The uranium mineralization is hosted in sandstone of the Jurassic-aged Morrison 
Formation, host to almost all of the significant uranium deposits in the Grants 
Uranium District. The mine was intended to be a room and pillar underground mine
but was never put into production. Activity ceased after a short trial mining phase
likely due to low uranium prices at the time. The underground mine infrastructure
included a 260m vertical shaft, ventilation shafts, mining adits and support buildings.
The mining shaft remains at the site and road access to the site is excellent.

In 2009, Monaro Mining NL (** “Monaro”** ) commissioned an independent geological
review and resource estimate for Rio Puerco using exploration data generated by 
Kerr-McGee in the 1960s and 1970s. The data used for the resource estimate consisted
of historical maps and data from 764 drill holes including downhole gamma-ray data
converted to percent equivalent U_( 3) O_( 8) (e U_( 3) O_( 8) ), geological logs
and drillhole survey data. They reported a JORC 2004-compliant inferred resource
of 6.0 million tonnes at an average grade of 0.09% eU_( 3) O_( 8) using a cutoff
grade of 0.03% eU_( 3) O_( 8 )for 11.4 million lbs. of contained U_( 3) O_( 8)^(
1 )(the “** Historic Resource”** ). JORC is the Australian Joint Ore Reserves Committee,
a professional code of practice that sets minimum standards for public reporting
of Mineral Resources.

In 2011, Australian-American Mining Corporation Ltd. commissioned a technical report
on Rio Puerco. This most recent report validated and confirmed the Historic Resource
^( 2) .

No significant exploration or development work has occurred at Rio Puerco since 
the 1970s.

**HISTORICAL RESOURCE ESTIMATES FOR THE RIO PUERCO PROJECT**

The historical resource outlined in this news release has not been verified and 
should not be relied upon. It is a historical estimate and not current and does 
not comply with Canadian NI 43-101 guidelines for the reporting of Mineral Resources.
A qualified person has not verified the historical resource on behalf of the Company
and North Shore has completed no work programs at Rio Puerco. Though not current,
the Company views the historical resource estimates as reliable and sufficient to
justify the initiation of work programs aimed at validating and potentially expanding
upon the estimates. There is no guarantee that the work programs envisioned by North
Shore will ultimately result in the definition of NI 43-101 compliant resources.

**RIO PUERCO TERM SHEET**

Completion of the Transaction is contingent on North Shore completing satisfactory
due diligence, execution of a definitive agreement, completion of a minimum $750,000
financing by North Shore and approval by the TSX Venture Exchange (the **“Exchange”**).
A finder’s fee may be payable to an arms-length third party upon completion of the
Transaction. The following highlights key terms of the Term Sheet executed by North
Shore and Resurrection, all currency references are in Canadian dollars:

 * **Milestone 1: **upon completion of the Transaction, a $125,000 cash payment 
   and issuance of 9.99% of the issued and outstanding shares of the Company, post-
   financing.
 * **Milestone 2, to earn a 40% interest in the Project:** on or before 18 months
   after completion of the Transaction, a $250,000 payment in cash or common shares,
   at the option of North Shore, and $750,000 in exploration expenditures.
 * **Milestone 3, to earn an aggregate 65% interest in the Project:** on or before
   36 months after completion of the Transaction, a $375,000 payment in cash or 
   common shares, at the option of North Shore, and $1,000,000 in additional exploration
   expenditures.
 * **Milestone 4, to earn an aggregate 87.5% interest in the Project: **on or before
   60 months after completion of the Transaction, a $500,000 payment in cash or 
   shares, at the option of North Shore, and $1,500,000 in additional exploration
   expenditures.
 * North Shore may elect to not continue to sole-fund exploration expenditures at
   any time after earning a 40% interest in Rio Puerco at which time North Shore
   and Resurrection will enter into a joint venture agreement to govern the funding
   of Rio Puerco on a proportional basis.
 * **Carried interest**: On completion of Milestone 4, North Shore will provide 
   Resurrection with a 12.5% free-carried interest in the Project through completion
   of an NI 43-101-compliant Preliminary Economic Assessment at which time Resurrection
   can elect to form a participating joint venture or convert their interest into
   a 1.0% net smelter returns royalty. North Shore will be granted a right of first
   refusal on Resurrection’s 12.5% interest.
 * **Bonus payments: **For the 78 month period after completion of the Transaction,
   North Shore will pay Resurrection a $100,000 bonus for each million lbs. of uranium
   estimated in current resources defined by the Company above 5 million and up 
   to 20 million lbs. in accordance with NI 43-101 standards, if and when such resources
   are defined.
 * **Other terms:** Resurrection shall have a participation right to maintain its
   9.99% interest in the common shares of North Shore for 5 years from completion
   of the Transaction and the right, but not the obligation, to appoint one nominee
   to the North Shore Board of Directors. All share issuances will be subject to
   Canadian and US securities law and will be priced in accordance with Exchange
   policies.

**NEXT STEPS**

After completion of the Transaction, North Shore will begin working towards defining
the first NI 43-101-compliant uranium resource at Rio Puerco. The Company’s initial
work will aim to verify historical data and determine whether a resource can be 
defined in accordance with NI 43-101. First, geologic models of the previously defined
deposit will be prepared using drill hole summary logs containing the interpreted
zones of uranium mineralization. A number of confirmation drill holes are required
to confirm the historic uranium grade and uranium disequilibrium, and for metallurgical
testing. For the first program, 20 to 40 holes are contemplated, a combination of
diamond core holes and rotary holes where a downhole gamma ray probe is used to 
determine uranium content. After the results of that program are received and interpreted,
a comprehensive drilling plan would be developed aimed at defining a resource. Data
from the drill programs will be used to further evaluate the amenability of ISR 
mining.

**ABOUT NORTH SHORE**

The nuclear power industry is in growth mode as more nuclear power will be required
to meet the world’s ambitious CO_( 2) emission-reduction goals and the needs of 
new power-intensive technologies like AI. In this environment, new discoveries of
economic uranium deposits will be very valuable, especially in established uranium-
producing jurisdictions like Saskatchewan and New Mexico. North Shore is well-positioned
to become a major force in exploration for economic uranium deposits. The Company
is working to achieve this goal by exploring its Falcon and West Bear properties
at the eastern margin of the Athabasca Basin in Saskatchewan, expanding its exploration
efforts to include the Grants Uranium District in New Mexico and by evaluating other
quality opportunities in the United States and Canada to complement its portfolio
of uranium properties. North Shore summarized its exploration efforts at its Falcon
property in a [May 27, 2025](https://pr.report/brqf) , news release.

**QUALIFIED PERSON**

Mr. Brooke Clements, MSc, P.Geol., a Qualified Person as defined by National Instrument
43-101 – _Standards of Disclosure for Mineral Projects _and the President and CEO
of North Shore, has reviewed and approved the scientific and technical disclosure
in this press release.

**ON BEHALF OF THE BOARD**

Brooke Clements,
President, Chief Executive Officer and Director

For further information:
Please contact: Brooke Clements, President, Chief Executive
Officer and DirectorTelephone: 604.536.2711Email: [b.clements@northshoreuranium.com](https://europeanbusinessmagazine.com/north-shore-announces-binding-term-sheet-for-rio-puerco-uranium-project-in-new-mexico-usa/b.clements@northshoreuranium.com)
[www.northshoreuranium.com](https://pr.report/brqg)

_Neither the TSX Venture Exchange nor its Regulation Services Provider (as that 
term is defined in the policies of the TSX Venture Exchange) accepts responsibility
for the adequacy or accuracy of this release._

_**Forward-Looking Statements**_

_This news release contains forward-looking statements that are based on the Company’s
current expectations and estimates. Forward-looking statements are frequently characterized
by words such as “plan”, “project”, “appear”, “interpret”, “coincident”, “potential”,“
confirm”, “suggest”, “evaluate”, “encourage”, “likely”, “anomaly”, “continuous” 
and variations of these words as well as other similar words or statements that 
certain events or conditions “could”, “may”, “should”, “would” or “will” occur. 
Such forward-looking statements involve known and unknown risks, uncertainties and
other factors that could cause actual events or results to differ materially from
estimated or anticipated events or results implied or expressed in such forward-
looking statements. Such factors include, among others: the completion and expected
terms of the Transaction, the parties’ abilities to meet the closing conditions 
of the Transaction, the number of securities to be issued by the Company in connection
with the Transaction, receipt of all necessary approvals for the completion of the
Transaction, the completion of satisfactory due diligence, execution of a definitive
agreement, completion of a minimum $750,000 or any financing by the Company, and
the Company’s ability to meet the Milestones, make the bonus payments or meet other
terms of the Transaction; the highly speculative nature of the Transaction given
the early-stage nature of Rio Puerco; the actual results of current and planned 
exploration activities including the potential for the definition of a mineral deposit
of potential economic value at the Company’s Falcon property in Saskatchewan; that
drilling results, geophysical survey results and/or interpretations thereof are 
defining potentially mineralized corridors; results from future exploration programs
including drilling; interpretation and meaning of completed and future geophysical
surveys; conclusions of future economic evaluations; changes in project parameters
as plans to continue to be refined; possible variations in grades of mineralization
and/or future actual recovery rates; accidents, labour disputes and other risks 
of the mining industry; the availability of sufficient funding on terms acceptable
to the Company to complete the planned work programs; delays in obtaining governmental
approvals or financing; and fluctuations in metal prices. There may be other factors
that cause actions, events or results not to be as anticipated, estimated, or intended.
Any forward-looking statement speaks only as of the date on which it is made and,
except as may be required by applicable securities laws, the Company disclaims any
intent or obligation to update any forward-looking statement, whether as a result
of new information, future events, or results or otherwise. Forward-looking statements
are not guarantees of future performance and accordingly undue reliance should not
be put on such statements due to the inherent uncertainty therein. Any forward-looking
statements contained in this news release are expressly qualified in their entirety
by this cautionary statement._

^(1) Monaro Mining NL, 2009, 250% increase in uranium resource inventory at Rio 
Puerco deposit, New Mexico USA: Monaro Mining NL ASX news release: ([link](https://pr.report/brqh))

^(2) Boyer, D. and Ostensoe, E., 2011, NI 43-101 technical report, Rio Puerco deposit,
Sandoval county, New Mexico, USA: Independent report commissioned by Australian-
American Mining Corporation Ltd.: ([link](https://pr.report/brqi))

**SOURCE: **North Shore Uranium Ltd.

![](https://app.accessnewswire.com/img.ashx?id=1042291)

View the original [press release](https://www.accessnewswire.com/newsroom/en/metals-and-mining/north-shore-announces-binding-term-sheet-for-rio-puerco-uranium-project-in-new-me-1042291)
on ACCESS Newswire
